Services
Waterproofing
Wet-area waterproofing completed to Australian Standard AS 3740 — the layer everything above it depends on.
Waterproofing is the part of a bathroom nobody sees and everything depends on. Once tiles are down, a shortcut in the membrane or the falls cannot be corrected without pulling the room apart again.
We treat waterproofing as a standalone discipline rather than a step tucked inside tiling, with wet-area work completed to Australian Standard AS 3740 and prepared, applied and checked in its own right. A waterproofing certificate is provided when applicable waterproofing work is completed.
What this covers
- Bathroom Waterproofing
- Shower Waterproofing
- Puddle Flange & Drain Preparation
- Substrate & Cement Sheet Preparation
- Shower Base Screeding & Falls

How we approach it
- Substrate first
- Cement sheeting, junctions and penetrations are prepared and made sound before any membrane is applied.
- Drains and falls
- Puddle flanges and drains are set correctly and shower bases screeded to fall so water goes where it should.
- AS 3740 waterproofing
- Wet-area waterproofing is completed to Australian Standard AS 3740, with each layer applied in the correct sequence before tiling starts.
On site

Waterproofing

Installation

Finished
Related services
- Bathroom Tiling & RenovationsBathroom tiling and renovation work from demolition and substrate preparation through screeding, waterproofing, tiling and final detailing.
- Tile Repairs & RestorationTargeted repairs, re-grouting, re-sealing and restoration of existing tiled surfaces.
- Outdoor & Balcony TilingTiling for balconies, terraces and outdoor areas.
Enquire
Talk to us about your project.
Tell us about the space and we'll get back to discuss the next step.
